Procon Systems
logo
Imagen
CERN PPS SPS Test Platform
1
Imagen
I&C cabinets for ITER
2
Pic legend 1: CERN PPS SPS Test Platform
Pic legend 2: I&C cabinets for ITER

General information

  • Company name
    Procon Systems
  • Adress
    Arquímedes 26, Badalona 08918, Spain
  • Turnover
    17.03 million EUR in year 2024
  • Employees
    80 in year 2024
  • SME
    YES
  • Contact Info:
    • Phone
      +34934609940
    • Email
      procon@proconsystems.net

Activity and Skills

With nearly 30 years of experience, Procon Systems has firmly established itself as a leader in advanced control systems, renowned for delivering cutting-edge technological solutions to some of the world’s most critical industries, including ITER and CERN. Our deep technical expertise enables us to design and implement highly customized control systems that not only enhance production efficiency but also uphold the highest standards of safety across operational processes and infrastructure.

At Procon Systems, we manage the complete lifecycle of projects with a technical excellence that spans from detailed requirement gathering and system design to manufacturing and flawless on-site installation. Our meticulous approach ensures every phase is executed with precision, adhering to the strictest quality standards.

Our services include:
- Functional safety projects
- Turnkey instrumentation and control projects
- I&C cubicle design and fabrication
- Engineering services

We also specialize in key technological areas, including automation, industrial networks, Industry 4.0, IIoT (Industrial Internet of Things), software development, and industrial cybersecurity—delivering sophisticated, cutting-edge solutions that streamline industrial processes, enable smart manufacturing, and safeguard critical infrastructure against cyber threats.

At Procon Systems, we are committed to driving innovation and delivering unparalleled value, helping our clients achieve their objectives and advance their operations with state-of-the-art technology that sets new industry standards.

Contracts for Big Science facilities

[ESO] Framework for for the Construction of Electronic Cabinets (2025 - 2026)
The project involves manufacturing, assembling, programming, verifying, and delivering electronic cabinets for the European Southern Observatory (ESO). It includes creating mechanical and electrical drawings, procuring components, and conducting Factory and Site Acceptance Tests
[ITER ORGANIZATION] Site-wide central supervision of ITER fire protection systems (2024 - 2030)
The project supervises and coordinates ITER's fire protection systems, ensuring occupational and environmental safety. It involves the Central Safety System for Occupational Safety (CSS-OS), which manages fire detection and protection monitoring functions, interfaces with fire panels, and displays monitoring information on workstations.
[ITER ORGANIZATION] PLC Expert support for PBS46 (2024 - 2025)
The project provides technical support for PBS46, focusing on PLC development and integration of plant interlock systems with the Central Interlock System
[ITER ORGANIZATION] Fire Protection Central System (2024 - 2029)
The project involves designing, manufacturing, and testing new central cubicles for fire monitoring. It integrates with the CSS-OS, covering activities like cubicle design, procurement, and Factory and Site Acceptance Tests.
[CERN] Provision of Project Development and Maintenance of Industrial Controls and Safety Systems Services (2023 - 2027)
The project involves developing and maintaining industrial control and safety systems. This includes designing and manufacturing the systems, integrating them with existing infrastructure, installing them on-site, and conducting thorough testing and commissioning. The project ensures compliance with safety standards and regulations, such as IEC 61511 for functional safety.
[ITER ORGANIZATION] Supply Contract for SCWS-TCWS I&C cubicles (2021 - 2025)
The project involves supplying control cubicles for SCWS and TCWS systems, including design, fabrication, testing, and delivery to the ITER site.
[F4E] Provision of System, Instrumentation and Control Engineering Support. (2021 - 2028)
Provision of services in the field of conventional Instrumentation and Control System Engineering aiming to support F4E with the preparation of technical specifications, the follow-up of contracts and the acceptance of systems
[ESO] Supply of M1 Electronic Cabinets (2020 - 2022)
Procurement of parts, fabrication and verification, FAT’s of 132 cabinets for the ELT Primary Mirror (M1) Cells.
[ITER ORGANIZATION] Central Safety System for Occupational Safety (CSS-OS) (2019 - 2029)
Design, fabrication, and commissioning of the CSS, which coordinates the locally distributed Plant Safety Systems (PSS) that are not part of the CSS. The CSS shall participate in the protection of people and the environment for the entire ITER site.
[ESO] 8-M Coater System Overhaul (2019 - 2020)
The main purpose of the 8-m coater control system overhaul was to migrate the as-used obsolete control system.
[CERN] Personnel Protection Systems for the SPS (2017 - 2022)
Supply, installation, testing and commissioning of the new Personnel Protection System (PPS) for Super Proton Synchrotron (SPS) at CERN.
[ALBA] Design and implementation of the Personnel Safety Systems (PSS) (2008 - 2025)
Supply, installation, testing and commissioning of the Personnel Safety System (PSS) for ALBA Synchrotron.

Relevant R&D projects

No registered projects