FERROVIAL CONSTRUCCION, S.A.
Ferrovial Construction Logo
Imagen
Aerial View October 19 ©ITER Organization-EJF Riche
1
Imagen
Tokamak Assembly pit_March 19_© ITER Organization EJF Riche
2
Pic legend 1: Aerial View October 19 ©ITER Organization-EJF Riche
Pic legend 2: Tokamak Assembly pit_March 19_© ITER Organization EJF Riche

General information

  • Company name
    FERROVIAL CONSTRUCCION, S.A.
  • Adress
    Ribera del Loira 42, 28042 - Madrid. España
  • Turnover
    7070.00 million EUR in year 2023
  • Employees
    19632 in year 2023
  • SME
    NO
  • Contact Info:
    • Phone
      +34913008500
    • Email
      desarrollo.construccion@ferrovial.com

Activity and Skills

FERROVIAL

Ferrovial is a global infrastructure company focused on the development and operation of sustainable infrastructures. The company business model is based on the integration of its 4 business units (Toll Roads, Airports, Construction and Energy). One example of this integration would be the early involvement of the construction division in the design stages, reinforcing the company’s capabilities and increasing its competitiveness.

Present in more than 15 countries with more than 24,000 employees around the world, of which around 20,000 are in Ferrovial Construction. Listed simultaneously on the Dutch, American and Spanish stock markets, where it is a member of the IBEX 35.

The company is committed with the decarbonization of its activities. The reduction of emissions (Scope 1&2) in absolute terms was of 29% compared to last year.

Ensuring the safety and well-being of the employees is a top priority for Ferrovial. In this regard, the serious injuries and fatalities frequency rate down by 20.3%.

Ferrovial's commitment to maintaining the highest environmental, social, and governance standards is endorsed by its inclusion in the Dow Jones Sustainability Index for the 22nd consecutive year. Furthermore, we maintain our position in indices such as FTSE4Good, CDP, Sustainalytics, MSCI, Moody’s, ISS ESG, and Bloomberg Gender Equality.

FERROVIAL CONSTRUCTION

The achievement of Ferrovial's strategy involves Construction. The division remains committed to innovation and technology to minimize its environmental footprint, generate a positive impact on society and ensure the safety of users and workers.

The United States and Poland, in addition to Spain as a market of origin, remain the division's main markets, accounting for around 80% of sales. Other geographies with a stable presence are the United Kingdom, France, Portugal, Ireland, Chile, Puerto Rico, Peru, Australia and Canada.

In 2023 revenues (EUR 7,070 million) increased by 9.4% vs 2022. It also represents 83 % of the whole Ferrovial revenues.

Its extensive experience is endorsed by having implemented more than 569 km of tunnels 16.374 km of new roads, 4.698 km of P3 highways, 6.257 km of new railway track (including 1.507 km of High-Speed rail), 446 water treatment plants, 12.993 M m2 of industrial buildings and so on.

Ferrovial Construction is currently working in the ITER project contributing with its expertise in construction of large industrial facilities, as well as a deep knowledge of a wide range of civil works and M&E activities. The company has also executed works in all nuclear plants in Spain.

Contracts for Big Science facilities

[F4E] (TB20) - Completion Doors in Tokamak Complex (2023)
Includes the design, qualification, manufacturing, and installation of heavy nuclear equipment (215 doors) for the ITER project. Includes mechanical and I&C conections.
[F4E] (TB18) - Civil works for Building 14 (Tritium Building) (2021)
Includes the Completion of Concrete works of Building 14 from L2 to R1, the installation of 4 Lift Lobby Doors, and the Civil Works for the Cargo Lift machinery room at R1 level, sorrounding steel structure and complementary cladding
[F4E] (TB06) HV Electrical Equipment (2014 - 2022)
Design, supply, installation, commissioning, testing and maitenance of electrical equipment (PBS43 and PBS41,PP) and design, construction, commisioning, testing and maintenance of buildings and associated infrastructure (F4E-OPE-428).
[F4E] (TB05) Design & Build Buildings 32,33 and 38 (2013 - 2019)
Includes the buildings 32 and 33 of 4.875 m2 each, where will be done the conversion of power supply for the energization of the magnets, and the building 38 which has an area of 778 m2 and will be where reactive power will be controlled. The main feature of these buildings is the existence of electromagnetic fields generated by the equipment included and this requires avoiding the use of ferrous materials in the range of the fields, and forcing to use concrete reinforced with fibers for some of the pillars, building walls and slabs of concrete of pits. The foundation will be underground to avoid being affected by electromagnetic fields.
[F4E] (TB07) Design & Build Buildings 64,67,68 and 69 (2013 - 2019)
Includes the Building 67 of 7.740 m2 which corresponds with storage tanks of hot and cold water for cooling towers, the building 68 of 416 m2 for water pumping station, the building 69 of 1.500 m2 for heat exchangers and the building 64 of 540 m2 for water treatment. In this contract, the building 67 is the work most important because its scope includes design, civil works and the installations, highlighting the foundations, structure and waterproofing of “hot & Cold basin”
[F4E] (TB03) Civil Engineering & Finishing Works (2012)
Includes a total of 11 buildings, storage areas, and bridges between buildings, highlighting among them the Tokamak complex (building 11-Tokamak, 14-Tritium and 74-Diagnostic) where will be located the reactor and 13-assembly building where will take place the previous assembly of elements.

Relevant R&D projects

No registered projects