FERROVIAL CONSTRUCCION, S.A.
Ferrovial Construction Logo
Imagen
Aerial View October 19 ©ITER Organization-EJF Riche
1
Imagen
Tokamak Assembly pit_March 19_© ITER Organization EJF Riche
2
Pic legend 1: Aerial View October 19 ©ITER Organization-EJF Riche
Pic legend 2: Tokamak Assembly pit_March 19_© ITER Organization EJF Riche

General information

  • Company name
    FERROVIAL CONSTRUCCION, S.A.
  • Address
    Ribera del Loira 42, 28042 - Madrid. España
  • Turnover
    7653.00 million EUR in year 2025
  • Employees
    18500 in year 2025
  • SME
    NO
  • Contact Info:
    • Phone
      +34913008500
    • Email
      desarrollo.construccion@ferrovial.com

Activity and Skills

Ferrovial is a leading global infrastructure company transforming highways, airports, and energy around the world. Its distinctive integrated business model supports the entire lifecycle of complex projects, from design and financing to construction, operation and maintenance. The company has a global presence and employs more than 22,500 people worldwide, approximately 18,500 of whom work in Ferrovial Construction. The company is also leading the development of the New Terminal One at JFK International Airport. Ferrovial shares trade on three stock markets: U.S. (Nasdaq100® Index), Spain (IBEX-35), and the Netherlands. The company is included in globally recognized sustainability indices such as the Dow Jones Best-in-Class Index.

Contracts for Big Science facilities

[F4E] (TB21) Electrical and Mechanical Works for the Tokamak Complex (2024)
Contract for the execution of critical electromechanical works within the Tokamak Complex and its associated buildings as part of the international ITER program. Its purpose is to deliver the essential electrical and mechanical infrastructure required to ensure the safe and reliable operation of the facilities. The scope includes the supply, design, and installation of medium‑ and low‑voltage electrical systems—covering power and control cables (LV, 22 kV, I&C), the deployment of busbars, electrical switchboards (SDBs), and key elements such as Load Centers—along with the implementation of lighting systems and fire detection solutions.
[F4E] (TB20) Completion Doors in Tokamak Complex (2023)
Includes the design, qualification, manufacturing, and installation of heavy nuclear equipment (215 doors) for the ITER project. Includes mechanical and I&C conections.
[F4E] (TB18) Civil works for Building 14 (Tritium Building) (2021 - 2024)
Includes the Completion of Concrete works of Building 14 from L2 to R1, the installation of 4 Lift Lobby Doors, and the Civil Works for the Cargo Lift machinery room at R1 level, sorrounding steel structure and complementary cladding.
[F4E] (TB06) HV Electrical Equipment (2014 - 2022)
Design, supply, installation, commissioning, testing and maitenance of electrical equipment (PBS43 and PBS41,PP) and design, construction, commisioning, testing and maintenance of buildings and associated infrastructure (F4E-OPE-428).
[F4E] (TB05) Design & Build Buildings 32,33 and 38 (2013 - 2019)
Includes the buildings 32 and 33 of 4.875 m2 each, where will be done the conversion of power supply for the energization of the magnets, and the building 38 which has an area of 778 m2 and will be where reactive power will be controlled. The main feature of these buildings is the existence of electromagnetic fields generated by the equipment included and this requires avoiding the use of ferrous materials in the range of the fields, and forcing to use concrete reinforced with fibers for some of the pillars, building walls and slabs of concrete of pits. The foundation will be underground to avoid being affected by electromagnetic fields.
[F4E] (TB07) Design & Build Buildings 64,67,68 and 69 (2013 - 2019)
Includes the Building 67 of 7.740 m2 which corresponds with storage tanks of hot and cold water for cooling towers, the building 68 of 416 m2 for water pumping station, the building 69 of 1.500 m2 for heat exchangers and the building 64 of 540 m2 for water treatment. In this contract, the building 67 is the work most important because its scope includes design, civil works and the installations, highlighting the foundations, structure and waterproofing of “hot & Cold basin”.
[F4E] (TB03) Civil Engineering & Finishing Works (2012 - 2023)
Includes a total of 11 buildings, storage areas, and bridges between buildings, highlighting among them the Tokamak complex (building 11-Tokamak, 14-Tritium and 74-Diagnostic) where will be located the reactor and 13-assembly building where will take place the previous assembly of elements.

Relevant R&D projects

No registered projects